Narmada River Bridge , Gujrat
- The Project included pre-thrown Extra Dosed Segment.
- The Project included Segment Launching with traveler.
- The Project Pier Table with cast-in-situ both side segment with Pilon for stress cable Bridge.
- We did the Project for Ashoka Buildcon Ltd.
- The Project was finished well inside expense of Rs 2 Crore.